Cutting downtime by 78% with a hybrid Azure migration
Challenge
A second-generation precision-machining shop was running production scheduling on aging Hyper-V hosts in a closet. Two unplanned outages in 2023 cost an estimated $94,000 in lost production.
Approach
Anutech designed a hybrid Azure landing zone, migrated their ERP and file shares to a paired East/Central US region, and kept latency-sensitive workloads on a refreshed on-prem cluster. We documented every system in a runbook.
Results
- 78% reduction in unplanned downtime over 12 months
- $72k saved in projected hardware spend over 3 years
- RPO improved from 24 hours to 15 minutes
- Successful disaster-recovery tabletop completed in Q1 2024